|
|
UCL The Darwin Building Department of Evolutionary Genomics This project involved the provision of new laboratory facilities for the evolutionary genomics group geneticists accommodated elsewhere in UCL. The refurbishment within the existing Darwin Building provides fully equipped, efficient, open plan molecular wet and microscopy laboratories, constant temperature rooms and support facilities including offices, computer rooms, write up spaces and preparation rooms. Accommodation is provided for high-throughput DNA analysis and gene expression profiling, which being located close to the culture and experimental rooms for the various model organisms will enable new experimental and research work to be undertaken under optimum laboratory conditions. Computer facilities have been enhanced, and building services upgraded including air handling, electrical power, data and lighting installations. The contract value was approximately £1.1 million and contract period 36 weeks. Department of Biochemistry & Molecular Biology This project involved the provision of new laboratory facilities with ancillary support areas at basement and sub-basement levels of the Darwin Building. The refurbishment provides fully equipped, air-conditioned laboratories with all essential services and support facilities including offices, write-up areas, plant and storage. The original basement areas comprised a dark, enclosed cellular layout restricted by low ceiling heights. A major objective of the new project was to achieve light, spacious and efficient specialist accommodation with a high level of intervisibility between the various spaces by the use of extensive internal glazing and careful integration of structure and services. The core facilities contain two suites of Microbiological Containment Laboratories. They comprise two Category 3 Laboratories and four Category 2 Laboratories all designed, constructed and operated in full accordance with the current guidelines of the Advisory Committee on Dangerous Pathogens. Further provision includes new fermentation and HPLC laboratories, dark rooms, preparation areas with autoclave facilities, centrifuge and incubator rooms, confocal microscopy, X-Ray diffraction, dedicated cold rooms and freezer accommodation. Close liaison with the users to provide the appropriate detailed solutions was maintained throughout the project. A complete renewal of building services supplying the new department was undertaken including ventilation, heating, cooling, filtration, chilled water, piped gases, electrical power, data and lighting installations. The contract value was £1.3 million and contract period 41 weeks. |